• Trail:
  • Catalyst (Don Valley)
  • Status:
  • Minor Issue / Yellow
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Nearing the end of Catalyst where orange fencing forced a steep downhill into a large mud pit due to construction fabric retaining water and mosquitoes, the fabric has been removed to allow water to pass and much of the overgrowth from underuse has ben cut back. Still a pain of a detour but a little easier passage. Enjoy the ride!

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    29° (15°/29°)
  • Precip
    0 mm/h
  • Wind
    4.27 km/h
  • Cloud Cover
    25%
  • Humidity
    0.41

Previous Reports

statusdatedescription
Jul 3, 2026 @ 5:55pm
Jul 3, 2026
It's riding well up until the old construction detour. I decided to see if it was possible to get to Sky Pilot. It's extremely overgrown and has... view
Jun 7, 2026 @ 10:26am
Jun 7, 2026
Thought I'd detour along Beth Nealson Rd to connect with Party Atmosphere. The road is gone! Appears to be another casualty of Ontario Line... view
Jun 1, 2026 @ 10:13am
Jun 1, 2026
It’s really good! I rode until the construction and then hike a biked around, up to the hydro tower, and took the old Sky Pilot down walking,... view

0 Comments






  • 0
  • Share with followers