Description:
Brushed and added some drainage swales along lower lost frog between Zephyr and Demon seed. Trying to get the water off the trail. Removed the one mud bog.
  • Work Report:
  • trail work done

  • 2 volunteer attendees
  • 10 volunteer hours
  • 2 total workers
  • 10.0 total work hours
Individual Workers:
Yellzee
hours: 5
paid: no
anonymous
hours: 5
paid: no

Local Weather During Report

  • Summary
    Drizzle
  • Temperature
    13° (13°/14°)
  • Precip
    0.37 mm/h
  • Wind
    22.59 km/h
  • Cloud Cover
    93%
  • Humidity
    0.93

0 Comments






  • 0
  • Share with followers