• Trail:
  • Bush Creek (Arrowtown Trails)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Wet - wet & tacky, likelihood of mud, be kind to trails
  • Reporter Primary Activity:
  • Mountain Bike
Description:
The downed trees have been moved off the track. Still some bogs up the top and some sections a bit overgrown with this wet summer but all good overall.
  • Work Report:
  • trail work done

  • 1 volunteer attendees

Previous Reports

statusdatedescription
Apr 27, 2026 @ 6:13pm
Apr 27, 2026
view
Apr 16, 2026 @ 4:19pm
Apr 16, 2026
Bridge mesh repaired and wall rebuilt on next bridge. Some drainage works complete. Lower section needs attention to drain over winter view
Apr 13, 2026 @ 2:40pm
Apr 13, 2026
Bridge mesh needs replaced on 90 degree bridge directly above the dam. Also entrance needs rock armouring and filled with dirt to remove step up... view