62.0 miles
Distance
9,183 ft
Climb
-8,774 ft
Descent
2,644 ft
High Point
409 ft
Altitude change
89 ft
Altitude min
89 ft
Altitude start
499 ft
Altitude end
0.1%
Grade
-70.3%
Grade max
67.6%
Grade min
31 miles
Distance climb
27 miles
Distance down
4 miles
Distance flat

Just trying to upload a route

Detailed Description
DISLO2021 is a 62 mile moderately popular expert route located near San Luis Obispo County California. This mountain bike only route. This route includes 30 trails. This route climbs 9,183 ft with a max elevation of 2,644 ft then descends -8,774 ft.

Trail Issues on Route

  • Significant Issue / Amber: 1 trail (newest: Mar 30, 2026)
  • Minor Issue / Yellow: 2 trails (newest: Sep 11, 2026)

Local Trail Association

Local trail association
Central Coast Concerned Mountain Bikers (www.cccmb.org)
Please consider joining or donating to the local riding association to support trail development & maintenance.
Donate to earn trail karma!

Stats

  • Distance
    62 miles
  • Altitude change
    409 ft
  • Altitude min
    89 ft
  • Altitude start
    89 ft
  • Altitude end
    499 ft
  • Climb
    2 miles
  • Descent
    -8,774 ft
  • Grade
    0.1%
  • Grade max
    -70.3%
  • Grade min
    67.6%
  • Distance climb
    31 miles
  • Distance down
    27 miles
  • Distance flat
    4 miles

34 Reviews & Comments


We hope you've been enjoying Trailforks!

Create a FREE account to view all route reviews and much more.

Details

no votes yet
close
Trail transparency
  • Singletrack
  • Unpaved
mtb
mtb
trail: South Loop
24
mtb
trail: South Loop
19
mtb
trail: South Loop
17

Recent Trail Reports Along Route

statustraildateconditiondescription
Under The Oaks
Sep 11, 2026 @ 11:10am (America/Los_Angeles)
Sep 11, 2026
Tree (or a very big branch) down along trail in one of the wooded sections. Easy to bypass but trail is starting to be rerouted around into the hill section already.
Poly Canyon Road
Aug 23, 2026 @ 9:06am (America/Los_Angeles)
Aug 23, 2026
Much smoother compared to the end of winter
Cerro San Luis Fire Road
Jul 26, 2026 @ 8:41am (America/Los_Angeles)
Jul 26, 2026
All clear
Stenner Flow
May 20, 2026 @ 11:25pm (America/Los_Angeles)
May 20, 2026
Trail got a complete overhaul top to bottom. Some minor work & trail maintenance may still happen here & there though all major work has been completed. PreRide ReRide FreeRide reporter
Flying Ewok-The Eucs
May 1, 2026 @ 2:58pm (America/Los_Angeles)
May 1, 2026
Berms could be built up a bit but other than that it’s aight’
more reports »
  • By henkelb & contributors
  • #33371 - 848 views

Hit the Trail

Open in App

Get this route on your phone instantly.

Download Route

Save to wishlist, Garmin & download.