more stats
1.6 miles
Distance
129 ft
Climb
-134 ft
Descent
00:10:27
Avg time
-6 ft
Altitude change
50 ft
Altitude min
118 ft
Altitude max
56 ft
Altitude start
49 ft
Altitude end
-0.1%
Grade
-14.1%
Grade max
13.7%
Grade min
3,084 ft
Distance climb
2,822 ft
Distance down
2,156 ft
Distance flat
00:10:27
Avg time

Trail Details

  • Activities
    • Mountain Bike
    • Gravel Bike
    • Hike
    • Trail Running
    • Snowshoe
  • Riding Area
    Willow Street
    Barnstable, Massachusetts
  • Difficulty Rating
  • Local Popularity
    65 in Mountain Biking [+]
    • 5 in Trail Running
    • 75 in Hiking
    • 5 in Snowshoeing
    • 100 in Gravel Biking
  • Global Ranking
    #258917 in Mountain Biking [+]
    • #431361 in Trail Running
    • #123253 in Hiking
    • #38543 in Snowshoeing
    • #5755 in Gravel Biking
  • State Ranking
    #7,717 in Mountain Biking · Massachusetts [+]
    • #15,602 in Trail Running
    • #4,966 in Hiking
    • #5,648 in Snowshoeing
    • #115 in Gravel Biking
  • Trail Type
    Paved Path
  • Bike Type
    XC, Gravel
  • Direction
    Both Directions
  • Dogs Allowed
    Yes
  • eBike Allowed
  • Land Owner
    Town of Barnstable

No community description for CCRT (under construction) trail has been added yet!

AI Generated Description

CCRT (under construction) is a 2 mile moderately popular white difficulty paved path trail located near Barnstable Massachusetts. This multi-use trail can be used both directions. On average it takes 10 minutes to complete this trail.

Tags
Local Trail Association
Traditionally Indigenous Territory

Recent Activity on Trail

Past Week
  • 0 rides
  •  
6 Months
  • 11 rides
  • 21 miles avg distance
All
  • 16 rides
  • Last: Aug 29, 2026
c1c2c3c4
January
February
March
April
May
June
July
August
September
October
November
December
update trails status or condition

CCRT (under... Trail Reports

no reports have been added for CCRT (under construction) yet, add a trail report.
Trail reports are used to indicate a trails current condition and inform builders and other users about any issues on a trail.
Status:
no votes yet
Your vote: 0

view (57)
close
      Directions to ccrt-under-construction trailhead (41.682500, -70.280560)

      Photos

      No photos have been added for CCRT (under construction) yet, add a photo.

      Videos

      no videos have been added for CCRT (under construction) yet, add a video.

      1 Review & Comments

      Tobyworks
      Ccrt….also known as “so much for arts trail”

      We hope you've been enjoying Trailforks!

      Create a FREE account to view all trail reviews and much more.

      • By dlafreniereTF Pro CC NEMBA & contributors
      • #831608 - 223 views

      Frequently Asked Questions

      ▼ Where is CCRT (under construction) located?
      CCRT (under construction) is located in Willow Street, Barnstable, Massachusetts, United States. It is part of the Willow Street trail network. The trailhead is located at coordinates 41.6825, -70.28056.
      ▼ How hard is CCRT (under construction)?
      CCRT (under construction) is rated as White difficulty. The average grade is 0.1%.
      ▼ What is the elevation gain for CCRT (under construction)?
      CCRT (under construction) has 129 ft of elevation gain. The trail has 134 ft of elevation descent. The elevation ranges from 50 ft to 118 ft.
      ▼ Is CCRT (under construction) a point to point trail?
      CCRT (under construction) is not a point to point trail. The direction is Both Directions. The trail type is paved path.
      ▼ How long is CCRT (under construction)?
      CCRT (under construction) is 1.6 miles long. The trail type is paved path.
      ▼ Are dogs allowed on CCRT (under construction)?
      Yes, dogs are allowed on CCRT (under construction). Please keep dogs on a leash where required and clean up after them.
      ▼ How do I access CCRT (under construction)? Where is the closest parking trailhead?
      The closest parking and trailhead locations to CCRT (under construction) are: View all parking locations in the area.
      ▼ How long does it take to ride CCRT (under construction)?
      Based on recorded activities, it takes an average of 10 minutes to ride CCRT (under construction). The trail is 1.6 miles long. Actual times will vary based on fitness level, conditions, and pace. View recent activity logs for more details.
      ▼ How busy is CCRT (under construction)?
      CCRT (under construction) is a moderately popular trail. There have been 49 recorded activities on this trail. The trail has received 57 check-ins. View recent activity on this trail.

      Hit the Trail

      Open in App

      Get this trail on your phone instantly.
      open trail in app

      Download Trail

      Save to wishlist, Garmin & download.
      save the trail

      Find Related Routes

      Find routes and users activities that include this trail.
      find routes for this trail

      You must enter a description before submitting.