More Filters
datedescriptioncondition
Aug 20, 2026 @ 7:56am (America/Creston)
Aug 20, 2026
mtb reporter Variableview
Aug 2, 2026 @ 8:35am (America/Creston)
Aug 2, 2026
mtb reporter Dryview
Jul 19, 2026 @ 8:33am (America/Creston)
Jul 19, 2026
mtb Dryview
Jun 14, 2026 @ 1:26pm (America/Edmonton)
Jun 14, 2026
mtb Excellent shape, super wet through the first rock garden after momma’s way, then nice dirt on the pink line to the bottom. Variableview
May 24, 2026 @ 6:55pm (America/Edmonton)
May 24, 2026
mtb Tiny tree down, right after the climb bit in the decent, before the turn down to the whoops. Idealview
May 24, 2026 @ 10:04am (America/Creston)
May 24, 2026
mtb There is still water running down the orange line. One pocket saw sized tree just after you start to descend the section below the power line. reporter Variableview
May 18, 2026 @ 6:41pm (America/Edmonton)
May 18, 2026
mtb Riding pretty slick, and tree down approximately 15cm diameter across the trail probably 150 metres down the trail from the power lines. Wetview
May 8, 2026 @ 8:47am (America/Edmonton)
May 8, 2026
mtb There is still water flowing down the trail in sections in the rock garden and snow near the jumps built/improved last season. There are quite a lot of sticks/branches on the trail as well. Trail Crew was on the trail yesterday and filled a new hole with a large rock - on the orange line. There is still water running in this section though so seeing the trail is difficult. It should be much better sometime next week. Note that Trail to Ale has not started yet so you can't get a sticker or free beer until that is officially on, and it won't be this week. reporter Variableview
May 5, 2026 @ 4:28pm (America/Edmonton)
May 5, 2026
mtb Several snow patches, some a foot deep, after 3 option rock garden section until the power line. Above and below this section is clear and dry reporter Variableview
Mar 30, 2026 @ 11:46am (America/Edmonton)
Mar 30, 2026
mtb Snow Coveredview
Sep 12, 2025 @ 10:57am (America/Creston)
Sep 12, 2025
mtb Idealview
Aug 29, 2025 @ 2:46pm
Aug 29, 2025
mtb New trail work is fantastic! The route options are all really well done. Idealview
Aug 13, 2025 @ 10:23am
Aug 13, 2025
mtb Good, still some moisture in places. Dryview
Jul 20, 2025 @ 6:37pm
Jul 20, 2025
mtb Amazing Idealview
Jul 19, 2025 @ 11:20am
Jul 19, 2025
mtb Idealview
Jul 18, 2025 @ 9:52pm
Jul 18, 2025
mtb Idealview
Jul 16, 2025 @ 5:47am
Jul 16, 2025
mtb P9 has had some more work done. There is now a third well-defined line through the rocky section and the three lines have been delineated by painted rocks. Pink, the right line, is the most straightforward and easiest. Start left and then turn right after a bit for the newest Yellow line - it's slower and more techy, with rock rolls and rock drops and a skinny. Stay left for the Orange line, which is faster, with some rock drops.

With all the new features, please ride with caution as there are unmarked gaps and drops on the trail. Preride, reride, freeride.
Idealview
Jul 14, 2025 @ 6:08pm
Jul 14, 2025
mtb Tree cleared by FTA trail crew Unknownview
Jul 11, 2025 @ 4:29pm
Jul 11, 2025
mtb tree down Unknownview
Jul 11, 2025 @ 7:07am
Jul 11, 2025
mtb The trail has had a significant amount of work and is riding great. Some trail features including gap jumps and drops have been added. As always, a pre-ride is highly recommended. Variableview
Jul 5, 2025 @ 4:21pm
Jul 5, 2025
mtb Additional to the previous report: the P9 descent has some freshly shaped dirt features that are now very soft due to the recent rain. It will be best to give them a few days to stiffen up. Variableview
Jul 4, 2025 @ 1:00pm
Jul 4, 2025
mtb P9 DH has some changes. Preride recommended. Work continues with a volunteer work party on Saturday July 5 - so it wouldn't be the best time to ride but would be an awesome time to come and help out. Meet at Island Lake lower parking area at 10 AM..... BBQ to follow. See FTA page for further details. Dryview
Jun 30, 2025 @ 1:58pm
Jun 30, 2025
ebike Idealview
Jun 28, 2025 @ 5:20pm
Jun 28, 2025
mtb Idealview
Jun 28, 2025 @ 9:09am
Jun 28, 2025
mtb Idealview

Login to view work report summary