More Filters
datedescriptioncondition
Jul 9, 2026 @ 7:04am (America/Halifax)
Jul 9, 2026
hike Tree harvesting is taking place close to the trail using heavy forestry machinery. Brush and branches are on sections of the trail. It is probably best to avoid cycling on this trail. Variableview
Jul 3, 2026 @ 8:49pm (America/Halifax)
Jul 3, 2026
mtb Trimmed overgrowth on Rocket Robert
Idealview
May 26, 2026 @ 8:56pm (America/Halifax)
May 26, 2026
mtb Manually snipped some overgrowth on Fitz, Sweet Severn, Rocket Robert and Thumper
Variableview
Dec 5, 2025 @ 5:46pm (America/Halifax)
Dec 5, 2025
mtb Cleared a couple of small downed trees
Snow Coveredview
Jun 23, 2025 @ 12:48pm
Jun 23, 2025
mtb Overgrown vegetation trimmed in lower Rocket Robert and LL1
Idealview
Jul 30, 2024 @ 9:24am
Jul 30, 2024
mtb Idealview
Jul 2, 2024 @ 1:53pm
Jul 2, 2024
mtb Trail is now open following trail repairs. Hope you enjoy the trail renovations. Some spots are tender and will need more time to dry completely but it open Idealview
Jun 27, 2024 @ 3:53pm
Jun 27, 2024
mtb Closed June 27 until further notice. Trail repairs have been completed and trail is too wet to ride or walk on.
Prevalent Mudview
Jun 27, 2024 @ 3:05pm
Jun 27, 2024
mtb Dirt Love Design building up trail to improve water flow to eliminate standing water. About 7 sections were worked on totaling 90 meters with the biggest section being 48 meters.
Variableview
Jun 26, 2024 @ 3:02pm
Jun 26, 2024
mtb Dirt Love Design building up trail to improve water flow to eliminate standing water. About 7 sections were worked on totaling 90 meters with the biggest section being 48 meters.
Variableview
Jun 23, 2024 @ 10:59am
Jun 23, 2024
mtb Annual trimming of overgrowth. Worked on Rocket Robert, Murrays Madness and Reindeer Road
Idealview
Mar 18, 2024 @ 2:55pm
Mar 18, 2024
mtb removed downed trees, traul is clear
Snow Cover Partialview
Oct 27, 2023 @ 12:53am
Oct 27, 2023
hike Variableview
Oct 15, 2023 @ 3:55pm
Oct 15, 2023
mtb Replaced bridge
Idealview
Jun 26, 2023 @ 4:37am
Jun 26, 2023
mtb Fiona cleanup had been completed and the trail is open.

The overgrown vegetation has been cleared.

Use caution on the trail, there have been changes since Fiona
Idealview
Jun 23, 2023 @ 4:22am
Jun 23, 2023
mtb Removed small tree down across trail
Idealview
May 1, 2023 @ 5:14pm
May 1, 2023
mtb Moved rocks to wet area on trail
Variableview
Apr 30, 2023 @ 4:47pm
Apr 30, 2023
mtb Dirt/rock work on trail, removed trees that were across the trail, rerouted in a couple of spots and roots were removed. The trail is in good shape but use caution, since Fiona, the trail has changed.
Idealview
Apr 27, 2023 @ 4:38pm
Apr 27, 2023
mtb Debris has been raked off the trail. There are a couple of locations that have been rerouted due to uprooted trees. Some earth work is still required and a couple of limbed trees are still across the trail (can be ridden over) Small tree down across trail, can ride over or around
Variableview
Feb 13, 2023 @ 12:13pm
Feb 13, 2023
mtb Removed large trees down across trail, trail is now clear from the lower bridge up to Alex MacLeod Road but caution should be used as the trail as changed in spots and some areas required trail repairs.
Variableview
Sep 27, 2022 @ 4:34am
Sep 27, 2022
mtb Fiona Damage. Trails Closed. reporter Unknownview
Jul 1, 2022 @ 3:31pm
Jul 1, 2022
mtb Cleared overgrown vegetation from Rocket Robert.
Idealview
Apr 25, 2022 @ 2:51pm
Apr 25, 2022
mtb Installed trail markers on Sweet Severn and Rocket Robert. Sweet Severn is mainly dry with one small wet spot. Rocket Robert is still wet in the usual spots. The trails are drying out nicely.
Variableview
Oct 26, 2021 @ 1:33pm
Oct 26, 2021
mtb Gas power leaf blower used to clear leaves from the following trails: Missing Link, Upper Fat Lip, Upper Sweet Severn, Kilt and Rocket Robert.
Idealview
May 29, 2021 @ 6:40am
May 29, 2021
mtb reporter Variableview

Login to view work report summary