The overall region status for Fitzpatrick Mountain is Caution as of Jul 9, 2026 ago
Trail Conditions Summary
Please log in to view the trail conditions summary.
| trail | date | description | condition | ||
|---|---|---|---|---|---|
Jul 9, 2026 @ 7:04am (America/Halifax) Jul 9, 2026 | hike Tree harvesting is taking place close to the trail using heavy forestry machinery. Brush and branches are on sections of the trail. It is probably best to avoid cycling on this trail. | Variable | view | ||
Jul 4, 2026 @ 8:52pm (America/Halifax) Jul 4, 2026 | mtb Trimmed overgrowth on Blowdown from the cell tower to the intersection at the C2C to windmills trail and then back on Fitz to the cell tower | Ideal | view | ||
Jul 4, 2026 @ 8:50pm (America/Halifax) Jul 4, 2026 | mtb Trimmed overgrowth on Bambi, Thumper and Fitz from the bridge by the bench to the intersection on Reindeer Rd. | Ideal | view | ||
Jul 3, 2026 @ 8:49pm (America/Halifax) Jul 3, 2026 | mtb Trimmed overgrowth on Rocket Robert | Ideal | view | ||
Jul 3, 2026 @ 8:47pm (America/Halifax) Jul 3, 2026 | mtb Trimmed overgrowth on Fitz from the Chalet Road to the intersection to Sweet Severn and from the Chalet Rd down to the bridge by the bench. | Ideal | view | ||
Jul 3, 2026 @ 8:44pm (America/Halifax) Jul 3, 2026 | mtb Trimmed overgrowth on Blowdown from the cell tower to Sweet Severn and Sweet Severn from behind the Chalets hot tub to Kilt | Ideal | view | ||
Jul 3, 2026 @ 8:39pm (America/Halifax) Jul 3, 2026 | mtb Trimmed overgrowth from entrance of the Scotsburn Trail Head park to the start of Reindeer Rd, Reindeer Rd and Murray's Madness | Ideal | view | ||
Jun 9, 2026 @ 8:55pm (America/Halifax) Jun 9, 2026 | mtb Manually snipped overgrowth from sections of trail on Fitz, Blowdown, Sweet Severn, Kilt, Bambi and Thumper | Variable | view | ||
May 26, 2026 @ 8:56pm (America/Halifax) May 26, 2026 | mtb Manually snipped some overgrowth on Fitz, Sweet Severn, Rocket Robert and Thumper | Variable | view | ||
May 8, 2026 @ 8:08pm (America/Halifax) May 8, 2026 | mtb The trails at Fitz are in good condition for cycling. With the wind and the leaning trees from Fiona there have been some trees and many branches on the trails. Many have been cleared but always cycle with the understanding that trail conditions can change and there may be hazards on the trails. | Variable | view | ||
May 8, 2026 @ 8:05pm (America/Halifax) May 8, 2026 | mtb Small trees and branches removed from trail - Blowdown and C2C to Windmills | Ideal | view | ||
May 8, 2026 @ 8:04pm (America/Halifax) May 8, 2026 | mtb Large trees down across trail, blocking trail - trail cleared | Ideal | view | ||
Apr 13, 2026 @ 8:03pm (America/Halifax) Apr 13, 2026 | mtb Large tree down across trail, blocking trail - tree removed | Snow Cover Partial | view | ||
Apr 11, 2026 @ 8:01pm (America/Halifax) Apr 11, 2026 | mtb Large tree down across trail, blocking trail - tree removed | Snow Cover Partial | view | ||
Jan 18, 2026 @ 11:06am (America/Halifax) Jan 18, 2026 | mtb Cleared falled trees and many branches from the chalets to the windmills and blowdown. One 8 inch tree is still across the trail but has been cut at each end. Too heavy and frozen in for 1 person to move. It is located on the double track on the windmills side of the bench near escape. Trail is snow covered and not ideal for cycling | Snow Covered | view | ||
Dec 21, 2025 @ 5:51pm (America/Halifax) Dec 21, 2025 | mtb Installed trail markers on Original Fitz on the section of trail that was rerouted by the chalets | Variable | view | ||
Dec 20, 2025 @ 1:49pm (America/Los_Angeles) Dec 20, 2025 | mtb Installed trail signs on Bambi and Thumper | Variable | view | ||
Dec 5, 2025 @ 5:46pm (America/Halifax) Dec 5, 2025 | mtb Cleared a couple of small downed trees | Snow Covered | view | ||
Oct 23, 2025 @ 3:55pm (America/Los_Angeles) Oct 23, 2025 | mtb Leaf Blowing: Windmills to Millsville | Ideal | view | ||
Oct 23, 2025 @ 7:18am (America/Halifax) Oct 23, 2025 | mtb Leaf blowing: Windmills trail | Ideal | view | ||
Oct 22, 2025 @ 3:54pm (America/Los_Angeles) Oct 22, 2025 | mtb Leaf Blowing: parts of upper Fitz, Sweet Severn and Kilt | Ideal | view | ||
Oct 22, 2025 @ 7:48pm (America/Halifax) Oct 22, 2025 | mtb Dirt work: repairing the entrance at the bottom of Rocket Robert. and the entrance at the top of Thumper. | Ideal | view | ||
Oct 21, 2025 @ 7:42pm (America/Halifax) Oct 21, 2025 | mtb Leaf blowing: Reindeer Road, Murray's Madness, Bambi and Lower Fitz | Ideal | view | ||
Oct 21, 2025 @ 7:36pm (America/Halifax) Oct 21, 2025 | mtb Leaf Blowing: Blowdown, Rocket Robert, Thumper and parts of Sweet Severn and Kilt | Ideal | view | ||
Oct 19, 2025 @ 6:52pm (America/Halifax) Oct 19, 2025 | mtb New Boardwalk installed | Ideal | view | ||
Oct 13, 2025 @ 6:35pm (America/Halifax) Oct 13, 2025 | mtb Removed old low bridge and installed a new low bridge. | Ideal | view | ||
Oct 5, 2025 @ 7:24pm (America/Halifax) Oct 5, 2025 | mtb Dirt work on trail to Green Up the trail | Ideal | view | ||
Oct 5, 2025 @ 7:21pm (America/Halifax) Oct 5, 2025 | mtb Dirt work on trail to Green Up the Trail | Ideal | view | ||
Oct 1, 2025 @ 7:23am (America/Halifax) Oct 1, 2025 | mtb C2C to Millsville, Blowdown, Fitz: removing trees and large branches hanging over the trail | Ideal | view | ||
Sep 28, 2025 @ 7:33pm (America/Halifax) Sep 28, 2025 | mtb LL: addng drainage, rocks and top soil to wet area on new trail | Ideal | view | ||
Sep 27, 2025 @ 7:20pm (America/Halifax) Sep 27, 2025 | mtb C2C to Millsville: Trimming with gas trimmers and loppers | Ideal | view | ||
Sep 26, 2025 @ 7:19pm (America/Halifax) Sep 26, 2025 | mtb MIllsville: clearing a few trees | Ideal | view | ||
Sep 24, 2025 @ 7:17pm (America/Halifax) Sep 24, 2025 | mtb Fitz, Lower Sweet Severn, Rocket Robert, Blowdown: Trimming with gas trimmers | Ideal | view | ||
Sep 23, 2025 @ 7:15pm (America/Halifax) Sep 23, 2025 | mtb Kilt: Trimming with gas trimmers | Ideal | view | ||
Sep 21, 2025 @ 5:27pm (America/Halifax) Sep 21, 2025 | mtb Dirt work near hunting blind: capping rocks with dirt and improving flow through this section of trail | Ideal | view | ||
Sep 18, 2025 @ 5:25pm (America/Halifax) Sep 18, 2025 | mtb Original Fitz: Trimming with gas trimmers and loppers on lower Fitz from the Chalet Road to the bridge | Ideal | view | ||
Sep 16, 2025 @ 5:23pm (America/Halifax) Sep 16, 2025 | mtb Reindeer Road and Murrays Madness: Trimming with gas trimmers and loppers | Ideal | view | ||
Sep 14, 2025 @ 5:22pm (America/Halifax) Sep 14, 2025 | mtb Kilt, Sweet Severn, Blowdown: Trimmed back thorny bushes after the woods closure prior to doing trimming with the gas trimmers | Ideal | view | ||
Sep 13, 2025 @ 5:18pm (America/Halifax) Sep 13, 2025 | mtb Original Fitz and Rocket Robert: Trimmed back thorny bushes after the woods closure prior to doing trimming with the gas trimmers | Ideal | view | ||
Jun 23, 2025 @ 6:57pm Jun 23, 2025 | mtb Most trails (Original Fitz, Reindeer Road, Murray's Madness, New Trails (LL1 and LL2), Kilt, Rocket Robert, Sweet Severn, Blowdown, C2C to the windmills (to intersection at Escape)) at Fitz have had the overgrowth cut back from June 15 to June 23. | Ideal | view | ||
Jun 23, 2025 @ 12:48pm Jun 23, 2025 | mtb Overgrown vegetation trimmed in lower Rocket Robert and LL1 | Ideal | view | ||
Jun 22, 2025 @ 11:00am Jun 22, 2025 | mtb Overgrown vegetation trimmed: Sweet Severn, Original Fitz from cell tower to intersection at Blowdown and C2C to windmills from Blowdown intersection almost to the bench at the intersection at Escape | Ideal | view | ||
Jun 22, 2025 @ 10:57am Jun 22, 2025 | mtb Overgrown vegetation trimmed and some raking: Sweet Severn, Original Fitz from cell tower to intersection at Blowdown and C2C to windmills from Blowdown intersection almost to the bench at the intersection at Escape | Ideal | view | ||
Jun 21, 2025 @ 10:55am Jun 21, 2025 | mtb Overgrown vegetation trimmed on Kilt, Rocket Robert, Alex MacLeod Road from Kilt to Rocket Robert and 551 from Kilt to Murray's Madness | Ideal | view | ||
Jun 21, 2025 @ 10:52am Jun 21, 2025 | mtb Overgrown vegetation trimmed on Original Fitz from the bench on lower Fitz to cell tower, Rocket Robert, Kilt, cell tower road, Alex MacLeod Road from Kilt to Rocket Robert and the 551 from Kilt to Murray's Madness | Ideal | view | ||
Jun 20, 2025 @ 10:47am Jun 20, 2025 | mtb Overgrown vegetation trimmed and raked on Blowdown from the lookoff to the Sweet Severn intersection, Sweet Severn from the intersection at Kilt to the exit to the field, the short exit from Sweet Severn to the field and the short exit from Kilt to the Alex MacLeod Road | Ideal | view | ||
Jun 19, 2025 @ 10:45am Jun 19, 2025 | mtb Overgrown vegetation: raked up trimmed vegetation and clipped overgrown branches from Blowdown from the cell tower to the look off and Original Fitz from the Chalets to the cell tower. | Ideal | view | ||
Jun 19, 2025 @ 10:43am Jun 19, 2025 | mtb Overgrown vegetation trimmed on Blowdown from the Lookoff to the cell tower and Original Fitz from the Chalets to the cell tower | Ideal | view | ||
Jun 18, 2025 @ 10:38am Jun 18, 2025 | mtb Overgrown vegetation trimmed and raked on Blowdown from the cell tower to the intersection of the C2C to windmills trail. | Ideal | view | ||
Jun 17, 2025 @ 11:00am Jun 17, 2025 | mtb Overgrown vegetation trimmed back from Reindeer Road, Murray's Madness, LL2, LL1 and lower Original Fitz. The start of trimming back the overgrowth for 2025. | Ideal | view | ||
Jun 17, 2025 @ 10:56am Jun 17, 2025 | mtb Removing a few trees across the trail on lower Sweet Severn | Ideal | view | ||
Jun 15, 2025 @ 10:52am Jun 15, 2025 | mtb Trimming low hanging branches on LL1, LL2, KIlt and Rocket Robert | Variable | view | ||
Jun 13, 2025 @ 10:51am Jun 13, 2025 | mtb Removed large tree blocking trail | Ideal | view | ||
Jun 12, 2025 @ 10:27am Jun 12, 2025 | mtb Large tree down across trail, blocking trail Tree removed | Unknown | view | ||
Jun 9, 2025 @ 10:26am Jun 9, 2025 | mtb Blowdown dirt work to improve trail | Variable | view | ||
May 30, 2025 @ 10:22am May 30, 2025 | mtb Large tree down across trail, blocking trail. Tree removed on Orginal Fitz. Another tree removed on another trail | Ideal | view | ||
May 4, 2025 @ 10:10am May 4, 2025 | mtb Dirt work on trail closer to Murray's Madness intersection and section near the small brook. Rock and Dirt work to build up trail to keep it dry. | Ideal | view | ||
Nov 24, 2024 @ 10:36am Nov 24, 2024 | mtb Constructing new trail to connect the the two new trails: Murray's Madness to 551 and Original Fitz to 551 Cutting trees, trimming and dirt work These 3 trails are open but still require dirt work and trail markers and names | Variable | view | ||
Nov 17, 2024 @ 10:35am Nov 17, 2024 | mtb Constructing new trail from Original Fitz to the 551 - Dirt work | Variable | view | ||
Nov 10, 2024 @ 10:34am Nov 10, 2024 | mtb Constructing new trail from Murray's Madness to the 551. Cutting trees, trimming and dirt work | Variable | view | ||
Nov 3, 2024 @ 10:31am Nov 3, 2024 | mtb Constructing new trail from Original Fitz to the 551. Cutting trees, trimming and dirt work | Variable | view | ||
Oct 26, 2024 @ 9:09am Oct 26, 2024 | ebike | Ideal | view | ||
Oct 26, 2024 @ 9:09am Oct 26, 2024 | ebike | Variable | view | ||
Oct 26, 2024 @ 9:09am Oct 26, 2024 | ebike | Variable | view | ||
Oct 25, 2024 @ 10:30am Oct 25, 2024 | mtb Many trails leaf blown in preparation for the Fondo | Ideal | view | ||
Oct 24, 2024 @ 10:29am Oct 24, 2024 | mtb Many trails leaf blown in preparation for the Fondo | Ideal | view | ||
Oct 20, 2024 @ 10:24am Oct 20, 2024 | mtb Original Fitz - Rock alignment at the bottom of Fitz Murray's Madness - rock armour covered with dirt Leaf blew a lot of the trails All in preparation for the Fondo | Ideal | view | ||
Sep 8, 2024 @ 10:31am Sep 8, 2024 | mtb The only wooden structure is broken. MTBPC's plan is to have this structure replaced in 2024. The debris from the harvesting activity has been cleared and any trail damage has been repaired. The trail is now open. | Ideal | view | ||
Sep 6, 2024 @ 4:30am Sep 6, 2024 | mtb There are a couple of issues with this trail. The bridge is broken. If conditions are dry, you can carry your bike and hike through this section. This bridge has been on MTBPCs 2024 work list to replace. There has also been some harvesting of Fiona damage very close to the intersection of the Dodgy Camp Road and the Windmills trail. You would have to carry your bike through this section as well (about 100 meters of trail). The current plan is to clear the brush off the trail from the harvesting activities. At the current time, MTBPC does not have a completion date for either of these projects. | Unknown | view | ||
Aug 9, 2024 @ 12:07pm Aug 9, 2024 | mtb Overgrown vegetation trimmed starting at the Windmills end of the trail and trimming to the brook after the field | Ideal | view | ||
Aug 8, 2024 @ 9:03am Aug 8, 2024 | mtb reporter | Unknown | view | ||
Aug 8, 2024 @ 8:49am Aug 8, 2024 | mtb reporter | Ideal | view | ||
Aug 6, 2024 @ 12:16pm Aug 6, 2024 | mtb Installed trail signs on all the Fitzpatrick Mountain Trails from Scotsburn to Millsville | Ideal | view | ||
Aug 5, 2024 @ 12:05pm Aug 5, 2024 | mtb Overgrown vegetation trimmed starting at the Windmills end of the trail | Ideal | view | ||
Aug 4, 2024 @ 5:29pm Aug 4, 2024 | mtb Overgrown vegetation - grass/vegetation was trimmed on Fitz from the chalet road to the cell tower road | Ideal | view | ||
Jul 31, 2024 @ 5:27pm Jul 31, 2024 | mtb Overgrown vegetation - grass/vegetation was trimmed on Sweet Severn | Ideal | view | ||
Jul 30, 2024 @ 9:24am Jul 30, 2024 | mtb | Ideal | view | ||
Jul 30, 2024 @ 9:24am Jul 30, 2024 | mtb | Ideal | view | ||
Jul 30, 2024 @ 9:24am Jul 30, 2024 | mtb | Ideal | view | ||
Jul 30, 2024 @ 9:24am Jul 30, 2024 | mtb | Variable | view | ||
Jul 27, 2024 @ 5:26pm Jul 27, 2024 | mtb Overgrown vegetation - grass/vegetation was trimmed Reindeer and lower section of Murray's Madness | Ideal | view | ||
Jul 27, 2024 @ 5:24pm Jul 27, 2024 | mtb Overgrown vegetation - grass/vegetation was trimmed on Kilt and the upper part of Murray's Madness | Ideal | view | ||
Jul 27, 2024 @ 5:23pm Jul 27, 2024 | mtb Overgrown vegetation - grass/vegetation was trimmed on Original Fitz from the chalet road down to the bench | Ideal | view | ||
Jul 24, 2024 @ 5:21pm Jul 24, 2024 | mtb Overgrown vegetation - grass/vegetation was trimmed on the C2C to windmills trail. | Ideal | view | ||
Jul 23, 2024 @ 5:17pm Jul 23, 2024 | mtb Overgrown vegetation - overgrown branches and grass/vegetation were trimmed from the Blowdown lookoff to the C2C to windmills trail. And from the C2C to windmills and Blowdown intersection back to the chalets | Ideal | view | ||
Jul 22, 2024 @ 5:13pm Jul 22, 2024 | mtb Overgrown vegetation - overgrown branches were trimmed from the chalets to the lookoff at the windmills | Ideal | view | ||
Jul 2, 2024 @ 1:55pm Jul 2, 2024 | mtb Trail is now open following trail repairs. Hope you enjoy the trail renovations. | Ideal | view | ||
Jul 2, 2024 @ 1:53pm Jul 2, 2024 | mtb Trail is now open following trail repairs. Hope you enjoy the trail renovations. Some spots are tender and will need more time to dry completely but it open | Ideal | view | ||
Jun 30, 2024 @ 9:54am Jun 30, 2024 | mtb Closed for muddy conditions. Trail Closures at Fitz. Due to the heavy rains will be closing some sections of the trails. Trail closed signs will be posted. The trails that were worked on last week are very wet and will need time to dry and then foot and bike traffic will be permitted. Hikers on these sections of trails today are causing a lot of damage. This will be a temporary measure. Once the trails have set up they will shed water during storms. | Wet | view | ||
Jun 29, 2024 @ 3:08pm Jun 29, 2024 | mtb Dirt Love Design building up trail to improve water flow to eliminate standing water on Original Fitz from the Scotsburn trailhead park to the long boardwalk, about 181 meters | Variable | view | ||
Jun 29, 2024 @ 8:14am Jun 29, 2024 | mtb Working with Dirt Love on Original Fitz from the Scotsburn Trail Head Park to the long boardwalk. Cutting trees and moving, tamping, slapping and shaping dirt. | Ideal | view | ||
Jun 29, 2024 @ 8:13am Jun 29, 2024 | mtb Working with Dirt Love on Original Fitz from the Scotsburn Trail Head Park to the long boardwalk. Cutting trees and moving, tamping, slapping and shaping dirt. | Ideal | view | ||
Jun 29, 2024 @ 8:12am Jun 29, 2024 | mtb Working with Dirt Love on Original Fitz from the Scotsburn Trail Head Park to the long boardwalk. Cutting trees and moving, tamping, slapping and shaping dirt. | Ideal | view | ||
Jun 29, 2024 @ 8:10am Jun 29, 2024 | mtb Working with Dirt Love on Original Fitz from the Scotsburn Trail Head Park to the long boardwalk. Cutting trees and moving, tamping, slapping and shaping dirt. | Ideal | view | ||
Jun 29, 2024 @ 8:07am Jun 29, 2024 | mtb Working with Dirt Love on this trail near the cell tower Tamping, slapping and shaping Also raked machine tracks out on Rocket and cleared trees from Fiona on Alec MacLeod rd /551 to try to connect up to Murrays Madness | Ideal | view | ||
Jun 28, 2024 @ 3:05pm Jun 28, 2024 | mtb Dirt Love Design building up trail to improve water flow to eliminate standing water and to reduce erosion. Below cell tower road about 26 meters, above cell tower road about 55 meters and C2C to windmills about 47 meters in two locations near cell tower. | Variable | view | ||
Jun 28, 2024 @ 8:04am Jun 28, 2024 | mtb Working with Dirt Love on Rocket Robert and Original Fitz (above and below the cell tower road). Tamping, slapping and shaping | Ideal | view | ||
Jun 28, 2024 @ 8:02am Jun 28, 2024 | mtb Trimming of overgrown vegetation on A MacLeod Road from Rocket to Kilt, and section of Rocket Robert, Sweet Severn and Original Fitz | Ideal | view | ||
Jun 27, 2024 @ 3:53pm Jun 27, 2024 | mtb Closed June 27 until further notice. Trail repairs have been completed and trail is too wet to ride or walk on. | Prevalent Mud | view | ||
Jun 27, 2024 @ 3:05pm Jun 27, 2024 | mtb Dirt Love Design building up trail to improve water flow to eliminate standing water. About 7 sections were worked on totaling 90 meters with the biggest section being 48 meters. | Variable | view | ||
Jun 27, 2024 @ 8:01am Jun 27, 2024 | mtb Annual trimming of overgrowth | Ideal | view | ||
Jun 26, 2024 @ 3:02pm Jun 26, 2024 | mtb Dirt Love Design building up trail to improve water flow to eliminate standing water. About 7 sections were worked on totaling 90 meters with the biggest section being 48 meters. | Variable | view | ||
Jun 26, 2024 @ 3:01pm Jun 26, 2024 | mtb Dirt Love Design rerouting wet section at the top of Fitz behind the chalet parking lot due to chronic water issues. 165 meter of new flowy trail built over 2.5 days. | Ideal | view | ||
Jun 26, 2024 @ 11:06am Jun 26, 2024 | mtb Annual trimming of overgrowth | Ideal | view | ||
Jun 26, 2024 @ 11:05am Jun 26, 2024 | mtb Helping Dirt Love on new section of Original Fitz near Chalet parking lot. This is a new route to avoid a muddy section. | Ideal | view | ||
Jun 26, 2024 @ 11:03am Jun 26, 2024 | mtb Helping Dirt Love on new section of Original Fitz near Chalet parking lot. This is a new route to avoid a muddy section. | Ideal | view | ||
Jun 25, 2024 @ 2:59pm Jun 25, 2024 | mtb Dirt Love Design rerouting wet section at the top of Fitz behind the chalet parking lot due to chronic water issues. 165 meters of new flowy trail build over 2.5 days | Ideal | view | ||
Jun 25, 2024 @ 11:02am Jun 25, 2024 | mtb Removed large tree down across trail, blocking trail | Ideal | view | ||
Jun 24, 2024 @ 2:55pm Jun 24, 2024 | mtb Dirt Love Design rerouting wet section at the top of Fitz behind the chalet parking lot due to chronic water issues. 165 meter of new flowy trail built over 2.5 days. | Ideal | view | ||
Jun 24, 2024 @ 11:00am Jun 24, 2024 | mtb Removed large trees across trail on Reindeer Road and Murrays Madness | Ideal | view | ||
Jun 23, 2024 @ 10:59am Jun 23, 2024 | mtb Annual trimming of overgrowth. Worked on Rocket Robert, Murrays Madness and Reindeer Road | Ideal | view | ||
Jun 23, 2024 @ 10:58am Jun 23, 2024 | mtb Annual trimming of overgrowth. Worked on Kilt and 551 | Ideal | view | ||
Jun 22, 2024 @ 10:57am Jun 22, 2024 | mtb Annual trimming of overgrowth. Working on Blowdown and Sweet Severn | Ideal | view | ||
Jun 16, 2024 @ 10:56am Jun 16, 2024 | mtb Annual trimming of overgrowth. | Ideal | view | ||
Jun 15, 2024 @ 10:52am Jun 15, 2024 | mtb Annual trimming of overgrowth. | Ideal | view | ||
Jun 14, 2024 @ 10:50am Jun 14, 2024 | mtb Annual trimming of overgrowth. | Ideal | view | ||
Jun 13, 2024 @ 10:55am Jun 13, 2024 | mtb Annual trimming of overgrowth. | Ideal | view | ||
Jun 13, 2024 @ 10:51am Jun 13, 2024 | mtb Annual trimming of overgrowth. | Ideal | view | ||
Jun 12, 2024 @ 10:53am Jun 12, 2024 | mtb Annual trimming of overgrowth. | Ideal | view | ||
Jun 12, 2024 @ 10:49am Jun 12, 2024 | mtb Annual trimming of overgrowth. | Ideal | view | ||
Jun 11, 2024 @ 10:47am Jun 11, 2024 | mtb Overgrown vegetation | Ideal | view | ||
May 26, 2024 @ 10:44am May 26, 2024 | mtb Flagging out a new trail to by-pass some of the Fiona Damage and to eventually link up with Rocket Robert and Murray's Madness | Ideal | view | ||
May 23, 2024 @ 3:44pm May 23, 2024 | mtb Trimming back overgrowth on Sweet Severn and Blowdown | Ideal | view | ||
May 22, 2024 @ 3:42pm May 22, 2024 | mtb Trimming back overgrowth from the Chalets to the windmills | Ideal | view | ||
May 17, 2024 @ 3:40pm May 17, 2024 | mtb Cutting back overgrowth on Kit and Rocket Robert | Ideal | view | ||
May 1, 2024 @ 3:36pm May 1, 2024 | mtb Bridge Maintenance on small bridge on reindeer road and bridge over the brook by the bench (downed hemlock area) on Fitz | Variable | view | ||
Apr 28, 2024 @ 3:34pm Apr 28, 2024 | mtb Scoping out new trail to join Fitz to Murray's Madness | Ideal | view | ||
Apr 23, 2024 @ 3:33pm Apr 23, 2024 | mtb Tree removal | Ideal | view | ||
Apr 22, 2024 @ 3:29pm Apr 22, 2024 | mtb Cutting back some trees | Ideal | view | ||
Apr 14, 2024 @ 3:25pm Apr 14, 2024 | mtb Rock armouring and a berm built | Variable | view | ||
Apr 11, 2024 @ 2:37pm Apr 11, 2024 | mtb Cleared brush from lower kilt. The entrance to lower Kilt has ruts due to harvesting operations. When harvesting had been completed, dirt work will be done to repair the trail. | Variable | view | ||
Apr 11, 2024 @ 2:35pm Apr 11, 2024 | mtb Cleared downed trees. As of this report the trail is clear from the Windmills to Millsville | Variable | view | ||
Apr 7, 2024 @ 3:13pm Apr 7, 2024 | mtb Rock armoured part of the trail to improve drainage to keep the trail dry | Variable | view | ||
Apr 7, 2024 @ 12:39pm Apr 7, 2024 | mtb Rock armoured part of the trail to improve drainage to keep the trail dry | Variable | view | ||
Apr 3, 2024 @ 1:34pm Apr 3, 2024 | mtb lower kilt is closed due to logging operations by the land owner. reporter | Unknown | view | ||
Apr 2, 2024 @ 3:07pm Apr 2, 2024 | mtb Cleaned up trail of any trees that fell during the winter and snipped back some of the overgrown trees | Snow Cover Partial | view | ||
Mar 25, 2024 @ 3:03pm Mar 25, 2024 | mtb Installed trail markers on the new section of trail and added missing markers on other trails (Kilt, Sweet Severn, Blowdown) | Variable | view | ||
Mar 19, 2024 @ 3:00pm Mar 19, 2024 | mtb Cleared trail of big tree, trail is clear | Snow Cover Partial | view | ||
Mar 18, 2024 @ 2:55pm Mar 18, 2024 | mtb removed downed trees, traul is clear | Snow Cover Partial | view | ||
Dec 12, 2023 @ 3:00pm Dec 12, 2023 | mtb Cleared downed trees from windstorm. Many trees that were leaning after Fiona will be causing grief for a while yet. Trees cleared on the following trails: Original Fitz, Sweet Severn, Kilt and Murray's Madness. | Variable | view | ||
Dec 8, 2023 @ 3:00pm Dec 8, 2023 | mtb Cleared downed trees from heavy snowfall | Variable | view | ||
Nov 30, 2023 @ 3:10pm Nov 30, 2023 | mtb Cleared trees that had fallen on the trail | Variable | view | ||
Nov 28, 2023 @ 3:00pm Nov 28, 2023 | mtb Replaced small bridge on Reindeer Road | Variable | view | ||
Nov 26, 2023 @ 3:00pm Nov 26, 2023 | mtb Moved repurposed boardwalk from the 551 to the tennis court for installation on Reindeer Road | Variable | view | ||
Nov 23, 2023 @ 3:00pm Nov 23, 2023 | mtb Rock armoring between the boardwalks by the hemlocks | Variable | view | ||
Nov 19, 2023 @ 3:00pm Nov 19, 2023 | mtb Dirt work carried out on part of the new sections of Reindeer Road and Murrays Madness. Also, the approaches to the main bridge were improved. | Variable | view | ||
Nov 10, 2023 @ 3:00pm Nov 10, 2023 | mtb Trails are still wet in normal spots. Original Fitz and other trails have been leaf blown | Variable | view | ||
Nov 9, 2023 @ 3:00pm Nov 9, 2023 | mtb Trail has been leaf blown and debirs has been cleared. There is still one tree that needs to be removed and some dirt work to improve trail conditions. Other trails have also been leaf blown. | Variable | view | ||
Nov 7, 2023 @ 2:00pm Nov 7, 2023 | mtb Trail is open About 70% of the trail has been cleared of all debris and dirt work has been completed on most of the uprooted trees. Ride trail with caution, there is still outstanding work to be done to improve the condition of the trail. | Variable | view | ||
Nov 6, 2023 @ 3:02pm Nov 6, 2023 | mtb Trail still needs to be cleared of branches and debris. The rerouted section will probably need more dirt work. The trail is open. Work completed dismantling the old bridge | Variable | view | ||
Nov 5, 2023 @ 3:00pm Nov 5, 2023 | mtb Broken wood/ttf structure has been replaced. Dirt work completed on rerouted section. Use caution. The trail still needs to be cleared of branches and debris but is open. | Variable | view | ||
Nov 4, 2023 @ 4:00pm Nov 4, 2023 | mtb Large tree down across trail, blocking trail. Cleared remaining large trees on the section of the trail that has been rerouted | Unknown | view | ||
Nov 3, 2023 @ 5:00pm Nov 3, 2023 | mtb Large trees blocking trail and low wooden bridge rotted. Prepping for bridge replacement | Unknown | view | ||
Nov 2, 2023 @ 5:00pm Nov 2, 2023 | mtb Large trees blocking trail and low wooden bridge rotted. Prepping for bridge replacement | Unknown | view | ||
Oct 29, 2023 @ 3:00pm Oct 29, 2023 | mtb Trail is open since Fiona and is passable with caution. Dirt work completed to improve trail flow. Still one section on lower kilt that requires work due to an uprooted tree. | Variable | view | ||
Oct 29, 2023 @ 2:00pm Oct 29, 2023 | mtb Large trees down across trail and low bridge is failing. Trail is not passable on a bicycle. Clearing and rerouting trail from hurricane Fiona Trail renamed from Maddy's Madness to Murray's Madness | Variable | view | ||
Oct 27, 2023 @ 12:53am Oct 27, 2023 | hike Sloppy muck in spots that tend to gather water during wet conditions. | Wet | view | ||
Oct 27, 2023 @ 12:53am Oct 27, 2023 | hike | Variable | view | ||
Oct 27, 2023 @ 12:53am Oct 27, 2023 | hike | Variable | view | ||
Oct 20, 2023 @ 12:00pm Oct 20, 2023 | mtb Wet in spots. Rock armored a section on Original Fitz | Variable | view | ||
Oct 15, 2023 @ 3:55pm Oct 15, 2023 | mtb Replaced bridge | Ideal | view | ||
Oct 15, 2023 @ 3:48pm Oct 15, 2023 | mtb Replaced 2 low bridges | Ideal | view | ||
Oct 14, 2023 @ 3:59pm Oct 14, 2023 | mtb Entry to capture off site bridge prep work. Work took place in September and October. Bridges were installed October 15 | Variable | view | ||
Oct 13, 2023 @ 3:45pm Oct 13, 2023 | mtb Overgrown vegetation has been cut back and the trail has been raked. The trail has changed since Fiona and will require dirt work to improve conditions and safely. It is passable with caution. It can be ridden as an in/out trail or to get to the trailhead park take the 551 to the TCT | Variable | view | ||
Oct 12, 2023 @ 7:00pm Oct 12, 2023 | mtb Trees blocking lower kilt have been cleared. The trail has changed since Fiona and will require dirt work to improve conditions and safely. It is passable with caution. It can be ridden as an in/out trail or to get to the trailhead park take the 551 to the TCT | Variable | view | ||
Oct 11, 2023 @ 3:39pm Oct 11, 2023 | mtb Trail is ideal. It is more challenging in places since Fiona. Trail work- prepping for the planned work on Oct 15 | Ideal | view | ||
Sep 9, 2023 @ 3:57am Sep 9, 2023 | mtb A lovely trail though with some sections near the Smith Rock Chalets being narrow with tree roots and rocks to navigate. It's doable for a novice mountain bike rider like me but the going is slow. Later on, the trail widens and becomes quite level. I have a Trek Fuel Ex-e class 1 (pedal assist) mountain ebike. I don't think I could have negotiated the trail without the motor helping out. | Variable | view | ||
Jun 26, 2023 @ 4:45am Jun 26, 2023 | mtb Trail is closed since Fiona. It is uncertain when it will be reopened | Unknown | view | ||
Jun 26, 2023 @ 4:45am Jun 26, 2023 | mtb Trail is closed since Fiona. It is uncertain when it will be reopened | Unknown | view | ||
Jun 26, 2023 @ 4:45am Jun 26, 2023 | mtb Trail is closed since Fiona. It is uncertain when it will be reopened | Unknown | view | ||
Jun 26, 2023 @ 4:43am Jun 26, 2023 | mtb Kilt is only clear from the Sweet Severn Intersection to the 551. Lower Kilt is still impassable. The Scotsburn Trailhead park can be accessed by taking the 551 to the TCT. | Variable | view | ||
Jun 26, 2023 @ 4:41am Jun 26, 2023 | mtb Reindeer is clear only from the Main Fitz bridge to the small bridge on Reindeer. This is in and out trail (no ability to make a loop) | Variable | view | ||
Jun 26, 2023 @ 4:38am Jun 26, 2023 | mtb Fiona cleanup had been completed and the trail is open. The overgrown vegetation has been cleared. Use caution on the trail, there have been changes since Fiona | Ideal | view | ||
Jun 26, 2023 @ 4:38am Jun 26, 2023 | mtb Fiona cleanup had been completed and the trail is open. The overgrown vegetation has been cleared. Use caution on the trail, there have been changes since Fiona | Ideal | view | ||
Jun 26, 2023 @ 4:38am Jun 26, 2023 | mtb Fiona cleanup had been completed and the trail is open. The overgrown vegetation has been cleared. Use caution on the trail, there have been changes since Fiona | Ideal | view | ||
Jun 26, 2023 @ 4:38am Jun 26, 2023 | mtb Fiona cleanup had been completed and the trail is open. The overgrown vegetation has been cleared. Use caution on the trail, there have been changes since Fiona | Ideal | view | ||
Jun 26, 2023 @ 4:38am Jun 26, 2023 | mtb Fiona cleanup had been completed and the trail is open. The overgrown vegetation has been cleared. Use caution on the trail, there have been changes since Fiona | Ideal | view | ||
Jun 26, 2023 @ 4:37am Jun 26, 2023 | mtb Fiona cleanup had been completed and the trail is open. The overgrown vegetation has been cleared. Use caution on the trail, there have been changes since Fiona | Ideal | view | ||
Jun 26, 2023 @ 4:37am Jun 26, 2023 | mtb Fiona cleanup had been completed and the trail is open. The overgrown vegetation has been cleared. Use caution on the trail, there have been changes since Fiona | Ideal | view | ||
Jun 26, 2023 @ 4:37am Jun 26, 2023 | mtb Fiona cleanup had been completed and the trail is open. The overgrown vegetation has been cleared. Use caution on the trail, there have been changes since Fiona | Ideal | view | ||
Jun 26, 2023 @ 4:34am Jun 26, 2023 | mtb Fiona cleanup had been completed and the trail is open. The overgrown vegetation has been cleared. Use caution on the trail, there have been changes since Fiona | Ideal | view | ||
Jun 25, 2023 @ 4:23am Jun 25, 2023 | mtb Annual whipper snipping of undergrowth from trails on Fitz completed. Completed a few root repairs on Two Towers to Millsville. Trail work will resume in the fall Just as a side note - the two towers are being dimantled | Ideal | view | ||
Jun 23, 2023 @ 4:22am Jun 23, 2023 | mtb Removed small tree down across trail | Ideal | view | ||
Jun 20, 2023 @ 4:20am Jun 20, 2023 | mtb Annual whipper snipping of undergrowth from trails on Fitz | Ideal | view | ||
Jun 19, 2023 @ 4:19am Jun 19, 2023 | mtb Annual whipper snipping of undergrowth from trails on Fitz | Ideal | view | ||
Jun 18, 2023 @ 4:17am Jun 18, 2023 | mtb Started annual whipper snipping of undergrowth from trails on Fitz | Ideal | view | ||
Jun 17, 2023 @ 1:46am Jun 17, 2023 | mtb | Unknown | view | ||
Jun 17, 2023 @ 1:46am Jun 17, 2023 | mtb | Variable | view | ||
Jun 15, 2023 @ 4:14am Jun 15, 2023 | mtb Raked trail and trimmed overgrowth with loppers from Millsville to the bench in the hemlocks, The trail is open but has changed in places - use caution Plus cleared horse manure from original Fitz | Variable | view | ||
Jun 11, 2023 @ 4:10am Jun 11, 2023 | mtb Cleared trees from Fiona from Snowmobile trail to the Sweet Sever/Freerider intersection. This section of the trail is open. The only route back to the Scotsburn Trailhead Park is the 551 to the TCT. The bottom of Kilt is still impasable. | Variable | view | ||
May 30, 2023 @ 8:00pm May 30, 2023 | mtb Cleared large trees down across trail from recent high winds | Ideal | view | ||
May 28, 2023 @ 2:00pm May 28, 2023 | mtb Cleared "go around" by the downed hemlocks trees, from the field to the bench. The trail can be used. Eventually some earth work will be required. | Variable | view | ||
May 21, 2023 @ 9:08am May 21, 2023 | mtb Cleared large trees down across trail, blocking trail. Reindeer road is clear from the main Original Fitz bridge to the bridge on Reindeer. There is a section that has been rerouted and needs earth work. This trail is an in/out trail for now. At some point in time, Reindeer will again meet up with Maddy's Madness. At this point it is unknown when this will be | Variable | view | ||
May 17, 2023 @ 5:04pm May 17, 2023 | mtb Cleared large tree down across trail, blocking trail from the Millsville Road entrance. The trail is clear from the Millsville Road to the bench in the hemlocks. A 'go around' needs to be build around the downed hemlock to meet up with the cleared section from the Two Towers to the field. | Variable | view | ||
May 14, 2023 @ 3:01pm May 14, 2023 | mtb Cleared large tree down across trail, blocking trail. The trail is clear from the 2 towers to the end of the field (then there is the large downed hemlock trees). This trail needs earth work to build a 'go around' the downed hemlocks. | Variable | view | ||
May 11, 2023 @ 2:40pm May 11, 2023 | mtb Cleared brush farther back off the trail Trail has changed since Fiona, please use caution when using the trails on Fitz | Variable | view | ||
May 7, 2023 @ 2:58pm May 7, 2023 | mtb Clearing large trees down across trail that are blocking the trail | Variable | view | ||
May 1, 2023 @ 5:14pm May 1, 2023 | mtb Moved rocks to wet area on trail | Variable | view | ||
Apr 30, 2023 @ 4:47pm Apr 30, 2023 | mtb Dirt/rock work on trail, removed trees that were across the trail, rerouted in a couple of spots and roots were removed. The trail is in good shape but use caution, since Fiona, the trail has changed. | Ideal | view | ||
Apr 30, 2023 @ 4:43pm Apr 30, 2023 | mtb Dirt/rock repairs on trail: by rock wall, replaced corduroy road with rocks and couple of trail repairs. There is still on big tree that has been limbed across the trail on Fitz. You can walk/ride under it. Use caution on the trail things are different since Fiona. | Ideal | view |
- previous page
Login to view work report summary
