• Fitzpatrick Mountain Region Status
    Oct 10, 2026
trail condition date description
Bambi Ideal
Oct 10, 2026 @ 3:23pm
Oct 10, 2026
Trimming overgrowth on Fitz to rock wall, Bambi and Reindeer
Blowdown Ideal
Oct 10, 2026 @ 3:22pm
Oct 10, 2026
Trimming overgrowth
Cape to Cape Trail - To The Windmills Snow Covered
Jan 22, 2026 @ 7:11am
Jan 22, 2026
Cleared falled trees and many branches from the chalets to the windmills and blowdown. One 8 inch tree is still across the trail but has been cut at each end. Too heavy and frozen in for 1 person to move. It is located on the double track on the windmills side of the bench near escape. Trail is snow covered and not ideal for cycling
Cape to Cape Trail - Windmills to Millsville Ideal
Oct 10, 2026 @ 3:23pm
Oct 10, 2026
Measuring bridges on Windmills to MIilsville, Reindeer Road and Rocket Robert. Drainage and trimming on Windmills to Millsville
Chalet Conector Ideal
Jun 26, 2023 @ 4:38am
Jun 26, 2023
Fiona cleanup had been completed and the trail is open. The overgrown vegetation has been cleared. Use caution on the trail, there have been changes since Fiona
Connector Unknown
Connector Unknown
Aug 8, 2024 @ 9:03am
Aug 8, 2024
reporter
Connector - A. MacLeod Rd Ideal
Aug 8, 2024 @ 8:49am
Aug 8, 2024
reporter
Durham Hill Unknown
Jan 8, 2025 @ 5:33pm
Jan 8, 2025
Freerider Unknown
Jan 8, 2025 @ 5:33pm
Jan 8, 2025
Grant Road Unknown
Jan 8, 2025 @ 5:33pm
Jan 8, 2025
Kilt Ideal
Oct 5, 2025 @ 3:17pm
Oct 5, 2025
Kilt: Trimming with gas trimmers
Murray's Madness Ideal
Oct 19, 2025 @ 2:38pm
Oct 19, 2025
Removed old low bridge and installed a new low bridge.
New Road Unknown
Jan 8, 2025 @ 5:33pm
Jan 8, 2025
Original FItz Ideal
Oct 10, 2026 @ 3:24pm
Oct 10, 2026
Replaced 2 bridges on Original Fitz: Entrance bridge and bridge by bench before the chalet road
Reindeer Road Ideal
Jul 6, 2026 @ 4:43pm
Jul 6, 2026
Trimmed overgrowth from entrance of the Scotsburn Trail Head park to the start of Reindeer Rd, Reindeer Rd and Murray's Madness
Rocket Robert Ideal
Sep 21, 2026 @ 3:45pm
Sep 21, 2026
Trail is open. Harvesting has taken place and the contractor did a great job preserving the trail. It is rideable just missing the tree canopy in places.
Sweet Severn Ideal
Jul 6, 2026 @ 4:54pm
Jul 6, 2026
Removing a few trees across the trail on lower Sweet Severn
Thumper Ideal
Oct 23, 2025 @ 4:09pm
Oct 23, 2025
Dirt work: repairing the entrance at the bottom of Rocket Robert. and the entrance at the top of Thumper.
Tower road climb Ideal
Oct 15, 2022 @ 4:11am
Oct 15, 2022
This section of the Fitz trails is open since Fiona
Displaying 1 - 20 of 20
  • Previous Page
  • Next Page