Open in App
Relatively flat ride starting in Greytown heading out toward Woodside following the Rail Trail then across sign posted trail following farm boundaries, dip onto river bead then joining back to the Cycle Trail at Kuratawhiti St and following through to Udy St Greytown. Back onto the road and into the township for a coffee...
The rail trail is flat and smooth riding for about 5km to Wood side.
The farm boundary track is undulating mostly flat grassy track. There are a couple of sections that drop you down to the river bed and follow 4x4 tracks then heads back up to the farm boundary exiting to open bush before exiting to Kuratawhiti St.
Remember to respect the farm lands you are crossing and watch for electric fences which may or may not be on.
Park and ride from Greytown end of the Rail Trail of park in town and ride to the Rail Trail from there.
From the Woodside end of the Rail Trail, exit to the road turning right as though your heading back to Greytown. About 100mtrs from getting on the road, turn left on to the gravel track on the right hand bend of the road. Just after entering the gravel track there is a style over the fence onto farm land. Follow the orange trail markers from there.
Service Road Atlas is a free to use, community-driven service for viewing and creating reports on the numerous back-country service roads around B.C. and Alberta.
Save the current map location and zoom level as your default home location whenever this page is loaded.
SaveWe hope you've been enjoying Trailforks!
Create a FREE account to view all trail reviews and much more.
You must enter a description before submitting.