Open in App
Reworked at the end of 2018/early 2019 the new Reactor Trail connects the Upper Perimeter trail over to the UVA Aerospace building, plunging down by the Reactor. Each direction starts with a fast flowy descent that hasn't worn down to the rock like most other trails on Ohill. Coming south to the split in the trail allows you to take a left down to a steep and challenging rock garden close to the Reactor building. The high line has some rollers and should always be taken headed north as the rock garden cannot be ridden up. A big ride under is on the other side of this gulley. The end of the trail is a solid climb on either end, with the southern option giving you the option to continue up the powerlines all the way to the top of Ohill.
| c1 | c2 | c3 | c4 |
|---|---|---|---|
January | February | March | April |
May | June | July | August |
September | October | November | December |
Service Road Atlas is a free to use, community-driven service for viewing and creating reports on the numerous back-country service roads around B.C. and Alberta.
Save the current map location and zoom level as your default home location whenever this page is loaded.
Save
No reviews yet, be the first to write a review or ask a question.
Use trail reports to comment on trail conditions.
We hope you've been enjoying Trailforks!
Create a FREE account to view all trail reviews and much more.
CAMBC & contributorsYou must enter a description before submitting.