• Significant Issue / Amber
  • Prevalent Mud - trail use not recommended, trail damage likely
titlestatusconditiondescription
Casuarina Optional LoopStill closed from New works. Please allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Casuarina Grove CircuitStill closed from New works. Please allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Three HillsPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
ExitPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
GoannaPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Happy ValleyPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
North Street Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
PetesPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Rocky HorrorPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
B+BsPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Wombats LoopPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Wombats ConnectionPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
WombatsPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Goanna LoopPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
AvatarPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Lost WorldPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
VertigoPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Terminator BlackPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Terminator BluePlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
RaptorPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
GG's TrackPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Super LoopPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
PandoraPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
ExplosionsPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Never Ending StoryPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
NettiPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
911Please allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Castle Hill Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Upper GGs TrackPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
N.E.S Midway ConnectionPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
N.E.S Super Loop ConnectionPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Coombabah Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Goanna to Fire Road LinkPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Goanna LinkPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Yarrayne Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
BarneysPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Centre Road Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Brookfield Reserve LinkPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Brookfield to Netti LinkPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Trailhead LinkPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Casuarina Grove Trailhead ConnectionStill closed from New works. Please allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
GC2018 Loop 1 DownhillPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Lost World to Super Loop ConnectionPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Never Ending Story Baileys LinkPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Hateful8Please allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Netti to Fire Road LinkPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Top DropPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Rocky Horror to Fire Road LinkPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
GC2018 Loop 3Please allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
SkroodPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
CCTVPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Training WheelsPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Catch Me If You CanPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Brookfield Court Reserve link to Lawnhill CourtPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
ElevatorPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Baileys to Explosions LinkPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Western Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
North West Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Saltwater Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Crane Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Kopps Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Nerang Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Billabirra Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Velodrome Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Apiary (AS5) Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
BaileysPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Explosions ConnectorPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
GG's LinkPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Casuarina Management TrailStill closed from New works. Please allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
GC2018 Loop 2Please allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Nathan Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Pademelon Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Jumbuck Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Coolibah Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Summer Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Bilby Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Blue Hill Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Fletcher Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
McGuire Court Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Matilda Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Easement Break Fire RoadPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
Gold Coast Criterium CircuitPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
TaipanPlease allow the trails to dry out after the recent weather event of 600mm in 3 days. Stick to the management trails if you must ride. Trailcare is on March 13 to repair much of the damage.
  • By Sonofhans NTCA
  • #21287