trail | region | date | description | hours | attendance | paid hours | paid attendance | |||
---|---|---|---|---|---|---|---|---|---|---|
Aug 15, 2022 @ 8:12am 32 mins | overgrowth along the open creek area and hill have been cleared of overgrowth 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 14, 2022 @ 6:41pm 14 hours | Did weed eating on Bomb Voyage and lower part of Gnarvest. Used a leaf blower to clear off the path. Trail looks good! 3 hours 2 attendees | Dry | view | 3 | 2 | |||||
Aug 14, 2022 @ 6:41pm 14 hours | Weed eating on Bomb Voyage and lower part of Gnarvest. Used a leaf blower to clear off the path. Trail looks good! 3 hours 2 attendees | Dry | view | 3 | 2 | |||||
Aug 14, 2022 @ 4:19pm 16 hours | Track check following up previous report. Light trail maintenance 2 hours 1 attendees | Ideal | view | 2 | 1 | |||||
Aug 14, 2022 @ 4:19pm 16 hours | Track check following up previous report. Light trail maintenance 2 hours 1 attendees | Ideal | view | 2 | 1 | |||||
Aug 14, 2022 @ 4:12pm 17 hours | Removed tree near the pond, all clear now! 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 14, 2022 @ 4:12pm 17 hours | Trail section braided (multiple alt lines), fences have now been installed by the trail volunteers to prevent further vegetation damage and soil compaction. Thank you to everyone who have been riding the trail the right way up. reporter 4 hours 3 attendees | Prevalent Mud | view | 4 | 3 | |||||
Aug 14, 2022 @ 2:18pm 18 hours | Fixed fences and railings will need some timber to finish this. Walked whole trail and the walking loop and cleared some drains but lots more to do. 1.5 hours 2 attendees | Dry | view | 2 | 2 | |||||
Aug 14, 2022 @ 12:19pm 20 hours | ridges, hills, and lower creek sections near the bird house section of the trail (middle portion of trail) have been cleared of overgrowth and small deadfall 4 hours 1 attendees | Dry | view | 4 | 1 | |||||
Aug 14, 2022 @ 11:49am 21 hours | Trimmed and brushed off the debris, removed dead trees and deadfall branches. Cleared the entrance trail to the MTN park and just a little bit of Rogue Fern to the right and left of the entrance. 4 hours 1 attendees | Dry | view | 4 | 1 | |||||
Aug 14, 2022 @ 7:35am 1 day | Trail Running Large tree down across trail, blocking https://www.instagram.com/reel/Cg3yA19l2gc/?igshid=MDJmNzVkMjY=trail Small tree down across trail, can navigate over or around Small tree down across trail, can navigate over or around Small tree down across trail, can navigate over or around Small tree down across trail, can navigate over or around Small tree down across trail, can navigate over or around | Snow Groomed | view | |||||||
Aug 13, 2022 @ 10:47pm 1 day | Wet | view | ||||||||
Aug 13, 2022 @ 9:28pm 1 day | Trimmed and brushed off the debris, removed a few dead trees. Didn’t quite finish today, made it from the beginning to the log drop. 2.5 hours 1 attendees | Dry | view | 3 | 1 | |||||
Aug 13, 2022 @ 6:58pm 2 days | Had been 3yrs since we were last here. Alder trees are nearly impassable. We machete chop some of the worst spots. I don't foresee this trail being passable next year unless a large force clears the alder saplings. 1 hours 2 attendees | Dry | view | 1 | 2 | |||||
Aug 13, 2022 @ 6:58pm 2 days | Had been 3yrs since we were last here. Alder trees are nearly impassable. We machete chop some of the worst spots. I don't foresee this trail being passable next year unless a large force clears the alder saplings. 1 hours 2 attendees | Dry | view | 1 | 2 | |||||
Aug 13, 2022 @ 5:44pm 2 days | Fixed up the very bottom bridge and a few other odds and ends. 1 hours 1 attendees | Very Dry | view | 1 | 1 | |||||
Aug 13, 2022 @ 5:22pm 2 days | Deadfall cleared. Thanks Humbert for the help! 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 13, 2022 @ 5:13pm 2 days | Cleared 3 trees end Demucking reporter 5 hours 2 attendees | Dry | view | 5 | 2 | |||||
Aug 13, 2022 @ 4:53pm 2 days | new bridge build begins 4 hours 2 attendees | Dry | view | 4 | 2 | |||||
Aug 13, 2022 @ 4:46pm 2 days | Built a new skinny to cross a small creek section. 3.5 hours 2 attendees | Ideal | view | 4 | 2 | |||||
Aug 13, 2022 @ 4:32pm 2 days | Brush clearing of 80% of the trail. Ran out of time, will come back soon to finish the job 2 hours 2 attendees | Dry | view | 2 | 2 | |||||
Aug 13, 2022 @ 3:24pm 2 days | Trail has been cleared, brushed and raked from Ravin to Booga Wooga. So it should be running nice. Thanks to all the volunteers who came out today to give this trail some love. Go get it. reporter 2 hours 6 attendees | Dry | view | 2 | 6 | |||||
Aug 13, 2022 @ 2:11pm 2 days | s'ha netejat i treballat la segona meitat, del Refugi dels Rasos a Baiasca, molt bon estat! 2 hours 1 attendees | Dry | view | 2 | 1 | |||||
Aug 13, 2022 @ 12:04pm 2 days | Cleared the tree. Although No View is not officially closed, if you ride the very bottom section you'll end up in the middle of the active tree thinning area. To avoid interfering with the workers, I would recommend taking all the right hand forks after the merge with delineator to end up on the Valley Dr cul-de-sac, or else just take the gravel road down from Zander's new culvert. 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 13, 2022 @ 11:51am 2 days | Tree cleared. Bridge inspected and decking secured. Good to go. 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 13, 2022 @ 11:00am 2 days | Raked a bunch of rocks of the trail 1 hours 1 attendees | Ideal | view | 1 | 1 | |||||
Aug 13, 2022 @ 10:40am 2 days | Cleared the deadfall 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 13, 2022 @ 8:58am 2 days | Maintained trails - trimmed back overgrowth, managed overgrown limbs and trimmed down. 4 hours 7 attendees | Dry | view | 4 | 7 | |||||
Aug 13, 2022 @ 8:18am 2 days | Cleared down tree from Tuesdays gone right at the punchy uphill bit. 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 13, 2022 @ 6:21am 2 days | Cleared tree reporter 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 13, 2022 @ 6:20am 2 days | Tree cleared reporter 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 13, 2022 @ 5:57am 2 days | Tree cleared reporter 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 13, 2022 @ 5:19am 2 days | E-Bike Cut out trees on the flats from from Scott’s hill to Fairforest creek bridge. reporter 4.5 hours 1 attendees | Dry | view | 5 | 1 | |||||
Aug 12, 2022 @ 11:32pm 2 days | trim & blow wave...working bee 3 hours 8 attendees | Dry | view | 3 | 8 | |||||
Aug 12, 2022 @ 10:43pm 2 days | Trail is re-opened. Rock roll to Gelding road is a little loose and drop off road is just roughed in. Scope it out before riding. 3 hours 5 attendees | Dry | view | 3 | 5 | |||||
Aug 12, 2022 @ 10:16pm 2 days | Cleaned up a lot of debris. Reinstated an old line by removing a rat run at end of Te Mounga. 3 hours 2 attendees | Dry | view | 3 | 2 | |||||
Aug 12, 2022 @ 6:56pm 3 days | Small tree down across trail, can navigate over or around | Variable | view | |||||||
Aug 12, 2022 @ 6:28pm 3 days | tree removed 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 12, 2022 @ 6:12pm 3 days | Trimmed and brushed off the debris, removed possible points of injury. 3.5 hours 1 attendees | Ideal | view | 4 | 1 | |||||
Aug 12, 2022 @ 5:50pm 3 days | Drainage and brake bumps feature12 onwards reporter 2.5 hours 1 attendees | Dry | view | 3 | 1 | |||||
Aug 12, 2022 @ 4:59pm 3 days | Tree Cleared by Timberlands reporter | Dry | view | |||||||
Aug 12, 2022 @ 2:52pm 3 days | Desmalezado y preparación para caimanera de descenso por el equipo Cerreros MTB de Maracay. 10 hours 6 attendees | Variable | view | 10 | 5 | 2 | 1 | |||
Aug 12, 2022 @ 11:48am 3 days | Brushed out July 2022, looks great! 2 hours 1 attendees | Wet | view | 2 | 1 | |||||
Aug 12, 2022 @ 11:47am 3 days | Brushed out in July 2022 6 hours 1 attendees | Variable | view | 6 | 1 | |||||
Aug 12, 2022 @ 11:46am 3 days | Trees at the bottom cut away. There is at least one more tree here that will fall soon, trail is clear now however 0.5 hours 1 attendees | Variable | view | 1 | 1 | |||||
Aug 12, 2022 @ 11:33am 3 days | Some minor rework on the lower section to address trail erosion issues between jabberwocky and the access to Aunty Nancy 10 hours 2 attendees | Variable | view | 10 | 2 | |||||
Aug 12, 2022 @ 6:16am Aug 12, 2022 | HTA stabilized rock alt. line on upper portion of the trail by the tricky switchback. 1.5 hours 4 attendees | Ideal | view | 2 | 4 | |||||
Aug 12, 2022 @ 3:34am Aug 12, 2022 | Weed eating and blew off trail. Trail is clear and looks good! 3 hours 2 attendees | Dry | view | 3 | 2 | |||||
Aug 12, 2022 @ 2:21am Aug 12, 2022 | Pas intéressant en VTT, chemin de 4x4 où pierrier à l’abondons | Dry | view | |||||||
Aug 12, 2022 @ 1:59am Aug 12, 2022 | Un pò di manutenzione da parte dei CIPS! all clear! 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 12, 2022 @ 1:38am Aug 12, 2022 | Tagliata la vegetazione su tutto il tratto da parte dei CIPS! Vegetation cut by CIPS trail building crew! 4 hours 1 attendees | Variable | view | 4 | 1 | |||||
Aug 12, 2022 @ 1:33am Aug 12, 2022 | Tagliata la vegetazione su tutto il tratto da parte dei CIPS! Vegetation cut by CIPS trail building crew! 3 hours 1 attendees | Ideal | view | 3 | 1 | |||||
Aug 12, 2022 @ 12:35am Aug 12, 2022 | Drainage reporter 1.5 hours 1 attendees | Dry | view | 2 | 1 | |||||
Aug 12, 2022 @ 12:34am Aug 12, 2022 | Repaired berm after people riding off edge reporter 1.5 hours 1 attendees | Dry | view | 2 | 1 | |||||
Aug 11, 2022 @ 11:49pm Aug 11, 2022 | Made reasonable progress on the seal section. About 2/3rds done. Dug a trench down one side. Found the outlet for first drain and Cleared the overgrown outlet. Swept debris from weed whacking. Started to take crown off side of metalled trail so water can get away. Will be good to see what happens in the rain. 2 hours 1 attendees | Dry | view | 2 | 1 | |||||
Aug 11, 2022 @ 8:19pm Aug 11, 2022 | clearing drains and debri off track. all good. 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 11, 2022 @ 5:35pm Aug 11, 2022 | Drains cleared. reporter 3 hours 1 attendees | Wet | view | 3 | 1 | |||||
Aug 11, 2022 @ 5:06pm Aug 11, 2022 | I removed the two logs and stump that were obstructing the exit. It’s overgrown with very sharp blackberry brambles — I didn’t do any trimming, just sawing. 0.5 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 11, 2022 @ 3:43pm Aug 11, 2022 | Still working on drainage on Creekside of “Paydirt” added retaining wall to stream to attempt to slow down the sloughing of dirt on the pass-through section of the trail. Also added retaining wall to the dip for the jump over the creek. 3 hours 1 attendees | Variable | view | 3 | 1 | |||||
Aug 11, 2022 @ 3:26pm Aug 11, 2022 | Trail just saw extensive clearing work done by original builder. Best shape its been in awhile! time to ride it 60 hours 1 attendees | Ideal | view | 60 | 1 | |||||
Aug 11, 2022 @ 3:20pm Aug 11, 2022 | Trees have been removed, trail could still use a rake and a little dirt work here and there to fill in water damage 1 hours 1 attendees | Variable | view | 1 | 1 | |||||
Aug 11, 2022 @ 2:50pm Aug 11, 2022 | Building new trail 6 hours 1 attendees | Dry | view | 6 | 1 | |||||
Aug 11, 2022 @ 2:44pm Aug 11, 2022 | Upper Levels is open but these trails south of the Trail Hub are not designated for MTB. Hiking only. | Dry | view | |||||||
Aug 11, 2022 @ 1:40pm Aug 11, 2022 | Trimmed and brushed off the debris, removed a few dead trees along the way 6 hours 1 attendees | Ideal | view | 6 | 1 | |||||
Aug 11, 2022 @ 11:47am Aug 11, 2022 | Built a few jumps and single track lines just off the side of the trail. 1 hours 1 attendees | Ideal | view | 1 | 1 | |||||
Aug 11, 2022 @ 11:28am Aug 11, 2022 | polovica skoku hotová + príjazd, nabudúce dopad 3 hours 1 attendees | Dry | view | 3 | 1 | |||||
Aug 11, 2022 @ 9:07am Aug 11, 2022 | Drainage work 6 hours 1 attendees | Dry | view | 6 | 1 | |||||
Aug 11, 2022 @ 7:52am Aug 11, 2022 | cleared blow down 1 hours 2 attendees | Dry | view | 1 | 2 | |||||
Aug 11, 2022 @ 5:08am Aug 11, 2022 | Mud hole In turn after last wall drop has been completely re-worked. muck has been stripped, whole section cambered to shed water. 1 water bar/roller added, 2 natural drains, and a banked turn on the high side to keep riders from pushing off the trail. Very last mud hole from last weeks work has been finished. we capped the turn with clay and steepened the turn a bit. sloped the whole section a bit more to keep the water from running straight down the trail. reporter 3 hours 5 attendees | Dry | view | 3 | 5 | |||||
Aug 11, 2022 @ 2:18am Aug 11, 2022 | 25 giugno tagliato vegetazione da parte dei CIPS...all clear! 2 hours 1 attendees | Ideal | view | 2 | 1 | |||||
Aug 11, 2022 @ 2:02am Aug 11, 2022 | 26 giugno eseguito taglio felci da parte dei ragazzi del trail del Motty! 2 hours 2 attendees | Dry | view | 2 | 2 | |||||
Aug 10, 2022 @ 8:27pm Aug 10, 2022 | big stump removed.. 1 hours 2 attendees | Dry | view | 1 | 2 | |||||
Aug 10, 2022 @ 6:29pm Aug 10, 2022 | All blowdowns removed. Lower switchbacks have now been brushed. Trail is running fast. 2 hours 1 attendees | Very Dry | view | 2 | 1 | |||||
Aug 10, 2022 @ 6:20pm Aug 10, 2022 | large tree removed....both tanks empty - mine and the saw. 2 hours 1 attendees | Dry | view | 2 | 1 | |||||
Aug 10, 2022 @ 5:52pm Aug 10, 2022 | need to spray reporter 2 hours 1 attendees | Dry | view | 2 | 1 | |||||
Aug 10, 2022 @ 5:02pm Aug 10, 2022 | Trail foliage cut, trail cleared debries, drains cleared 2 hours 5 attendees | Dry | view | 2 | 5 | |||||
Aug 10, 2022 @ 4:44pm Aug 10, 2022 | The last of the road sign plates put in. 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 10, 2022 @ 3:44pm Aug 10, 2022 | Hike Cleared tree reporter 0.5 hours 2 attendees | Dry | view | 1 | 2 | |||||
Aug 10, 2022 @ 3:25pm Aug 10, 2022 | mowed and cleared out recently 1 hours | Ideal | view | 1 | ||||||
Aug 10, 2022 @ 2:41pm Aug 10, 2022 | Parte alta ripulita fino all'incrocio con la strada del cimitero 3 hours | Dry | view | 3 | ||||||
Aug 10, 2022 @ 11:43am Aug 10, 2022 | Poprawiłem i zagrabiłem dołek na początku, da się teraz tutaj mocniej rozbujać. Przy okazji dojazd do Druciaka / Indianina od górnej ( zachodniej ) części Tatanki jest oczyszczony i odchaszczony z gałęzi. 2 hours 1 attendees | Ideal | view | 2 | 1 | |||||
Aug 10, 2022 @ 10:59am Aug 10, 2022 | E-Bike se han retirado los árboles caidos 2 hours 1 attendees | Dry | view | 2 | 1 | |||||
Aug 10, 2022 @ 10:57am Aug 10, 2022 | E-Bike retirado el árbol que estaba a punto de caer sobre el sendero 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 10, 2022 @ 10:57am Aug 10, 2022 | E-Bike árbol quitado. quedan dos árboles enormes a la salida del sendero, pero con la sierra de mano no los puedo quitar, hace falta motosierra. se pueden pasar por debajo 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 10, 2022 @ 10:54am Aug 10, 2022 | E-Bike está recién limpiado, ya se puede pasar 2 hours 1 attendees | Dry | view | 2 | 1 | |||||
Aug 9, 2022 @ 8:57pm Aug 9, 2022 | Mess of fallen black wattle cleared 2 hours 2 attendees | Wet | view | 2 | 2 | |||||
Aug 9, 2022 @ 8:54pm Aug 9, 2022 | Trail Re-routed around fallen Marri & Tree cleared. 4 hours 2 attendees | Wet | view | 4 | 2 | |||||
Aug 9, 2022 @ 8:22pm Aug 9, 2022 | tree removed. this was the one reported yesterday as being in Highway 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 9, 2022 @ 7:51pm Aug 9, 2022 | 2 Trees cleared. 1 about 3/4 of the way down and 1 at the exit CK/AF reporter | Dry | view | |||||||
Aug 9, 2022 @ 7:50pm Aug 9, 2022 | Tree Cleared CK/AF reporter | Dry | view | |||||||
Aug 9, 2022 @ 6:59pm Aug 9, 2022 | tree removed 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 9, 2022 @ 6:32pm Aug 9, 2022 | Tree removed. On the connector trail. Thanks for reporting it. 2 hours 1 attendees | Dry | view | 2 | 1 | |||||
Aug 9, 2022 @ 6:02pm Aug 9, 2022 | fallen limb trimmed off ....can't find Jo's huuuge tree! 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 9, 2022 @ 5:48pm Aug 9, 2022 | Working on drainage 6 hours 1 attendees | Dry | view | 6 | 1 | |||||
Aug 9, 2022 @ 5:20pm Aug 9, 2022 | tree removed 1 hours 1 attendees | Dry | view | 1 | 1 | |||||
Aug 9, 2022 @ 5:08pm Aug 9, 2022 | Tree removed. Ditches cleaned out. Removed gravel off the trail. 2 hours 1 attendees | Dry | view | 2 | 1 | |||||
Aug 9, 2022 @ 4:45pm Aug 9, 2022 | Getting some good dirt on the trail! Found a natural runoff of washed up gravel! Using it up to help with the super muddy sections. Leveled out jump so it didn’t vear to the left so bad added chicken wire to slick sections. 3 hours 2 attendees | Variable | view | 3 | 2 | |||||
Aug 9, 2022 @ 4:15pm Aug 9, 2022 | weed whipped 4 hours 1 attendees | Dry | view | 4 | 1 | |||||
Aug 9, 2022 @ 2:10pm Aug 9, 2022 | ~1.5mi of mustard whipped and raked. 1 attendees | Dry | view | 1 | ||||||
Aug 9, 2022 @ 10:05am Aug 9, 2022 | Brushed and surrounding trails reporter 3 hours 1 attendees | Dry | view | 3 | 1 |
Displaying 1 - 100 of 34138
Previous Page | Next Page