Open in App
Originally built in 2003 by Makara Peak Supporters, an extension was funded by WCC and built by TGL in 2018 which links the summit to Aratihi and then onwards to the south west corner of the park.
The new section is a machine built flow trail with berms, rollers and table tops to keep riders of all abilities interested. The top section of trail crosses a short bridge over the top of the A2Z trench before winding it's way down the hill to meet the original Upper Leaping Lizard trail. Located on the north side of the peak, expect to be battered and blown around in a strong northerly.
The original trail is a bit narrower, with a rockier surface and is a touch more technical. Surfacing and drainage work was completed by TGL in late 2018, plus a bypass of a particularly steep section of the trail was built.
Starting from the summit, it can also be accessed 50 metres uphill from the intersection of Upswing and Aratihi
| c1 | c2 | c3 | c4 |
|---|---|---|---|
January | February | March | April |
May | June | July | August |
September | October | November | December |
Service Road Atlas is a free to use, community-driven service for viewing and creating reports on the numerous back-country service roads around B.C. and Alberta.
Save the current map location and zoom level as your default home location whenever this page is loaded.
SaveWe hope you've been enjoying Trailforks!
Create a FREE account to view trail comments and much more.
MPS MP Trail Crew & contributorsYou must enter a description before submitting.